The chiller replacement project has begun. Two large holes were core drilled today. Here are two views from a 3rd floor office looking upward:
Here are the same two holes from the 4th floor (penthouse) side:
The next two pictures show the equipment used to drill the holes:
This picture shows the equipment to be replaced:
The last two pictures for today show some of the parts and other equipment in the penthouse:
No comments:
Post a Comment