Last week the temporary chiller was moved slightly, hooked up, and made operational. Here is a view from the building looking down into the alley:
The office ceiling through which the permanent pipes for the temporary chiller pass is shown next. The gray pipes can no longer be seen as they have been wrapped in a white-coated insulation.
1 comment:
Nice picture of your temporary chiller. Thanks for sharing.
Post a Comment